One contractor quotes 1,800 for a corridor repair and another quotes 2,050. The first has excluded disposal and requires a separate visit to finish the surface. The apparent saving may vanish once both estimates cover the same handover. The facilities manager needs a comparison the owner can understand.
Write the job in observable terms
Define the location, outcome, access restrictions, working window and evidence the manager needs at completion. Put each contractor's inclusions and exclusions against those items. Flag an unanswered point as open. A blank cell should never become an assumption about what the contractor will deliver.
Capture the reason for the instruction
Ask both bidders to clarify material differences. Suppose the higher estimate includes an evening visit that keeps a tenant's entrance open during trading hours. Record that operational benefit alongside the comparable costs, then retain the authorised quote with the work order. In Numerish, procurement and facilities meet at the repair-authorisation stage. The same scope gives the person signing off the repair a specific outcome to verify.
More to discover in Numerish.
Explore related insights and practical enterprise workflows.