A reserved port can look occupied long after a customer postpones an installation. Releasing it too early creates the opposite problem when the engineer arrives and finds the last available port assigned elsewhere. Treat the reservation as a decision with a named owner and a time limit.
Record what the order is holding
The planner needs the resource identifier, service order item, site, scheduled installation and the next review date. Distinguish a temporary hold from an assignment verified in the field. If two orders appear to reserve port 12, reconcile the underlying identifiers and the physical location before asking either customer to move.
Handle postponements explicitly
A retail branch delays its opening by six weeks. Check whether the revised date fits the current hold and whether another confirmed order needs that port. Document an extension or release, tell the order owner, and identify the replacement planning task if needed. In Numerish, that decision belongs between order acceptance and provisioning. Track how many reservations reach their review date without a decision to see where available capacity is being understated.
More to discover in Numerish.
Explore related insights and practical enterprise workflows.