A façade contractor completes a perimeter panel and the fit-out contractor arrives several weeks later. If both assumed the other would supply the closure at the slab edge, the gap can remain invisible until finishes are due. The first task is to define the interface in terms that both teams can locate and price.
Name the physical boundary
Bring the package scopes and the same detail revision to the coordination meeting. Mark who supplies the closure, who installs it and who accepts the completed interface. If the scope is genuinely unsettled, record a decision owner and the last date for an answer before the sequence changes. A generic item for “coordinate façade works” gives the scheduler little to act on.
Give the next trade a usable release
For example, release bays one through four to fit-out when the agreed close-up record is complete. Leave bay five visibly open pending clarification of a differing detail. Record that boundary in the package handover. The receiving supervisor can plan a full day’s available work without assuming the entire elevation is ready.
More to discover in Numerish.
Explore related insights and practical enterprise workflows.