One tractor can work three fields in a day, but a meter reading belongs to the machine. Allocating the increase in meter hours to land area alone can hide a long transfer or charge a field for time spent on another crop.
Reconcile the day to the meter
Suppose the meter rises from 410.2 to 418.2. Signed activity entries show 3.0 hours in Field A, 2.5 in B and 1.5 in C. A further hour remains. Check the driver's route or shift notes. If the hour was travel between units, classify it using the farm's agreed travel allocation. If nobody can identify it, keep the hour visible for the supervisor.
Hand the accountant a reproducible basis
Record the machine, date, field, season and activity with each block. If the equipment charging rate is 40 per hour, Field A's direct charge is 120 before any travel allocation. Farm360's field work record gives the accountant a way to follow that amount back to work performed and ask about the unresolved hour before close.
More to discover in Numerish.
Explore related insights and practical enterprise workflows.



