A shift reports 98 accepted units from 100 started. The number looks encouraging, but it does not reveal how many items passed through inspection twice. Quality and production need both measures when deciding whether to investigate a recurring defect.
Give each measure its own numerator
Suppose 89 units pass on the first attempt, nine pass after rework and two are scrapped. First-pass yield is 89 divided by 100, or 89 percent. Final accepted yield is 98 divided by 100, or 98 percent. In both cases the original 100 remain the denominator. Counting the nine reinspection attempts as new units would distort comparisons with another shift.
Choose the measure for the decision
For today’s dispatch the warehouse needs the released quantity of 98. For improvement work, the supervisor needs to understand the eleven units that failed first inspection and the time used for rework. Link the relevant Manufacturing360 operation logs and batch dispositions to the shift being reviewed. That preserves both the customer-facing result and the performance of the original process.
More to discover in Numerish.
Explore related insights and practical enterprise workflows.



