Jump to a section
A technician marks a service task complete at 10:00. A scheduler immediately allocates an order to the line. Trouble follows if the completion time was mistaken for the site's accepted handback time and the production supervisor was still awaiting review.
Capture both events
In an example log, the technician completes the recorded service at 10:00, the designated site reviewer confirms the required checks at 10:25 and production accepts handback at 10:35. Record the asset identifier, maintenance work order, acceptance time and any documented restrictions. A similar machine on the next line should never inherit the availability decision by mistake.
Connect release to the schedule
The planner can now state which production order may resume and explain the 35-minute difference between service completion and accepted availability. If the acceptance remains outstanding, leave the affected slot visible to the scheduler as unavailable. The Numerish maintenance handback workflow connects Assets360 and Manufacturing360 so the maintenance history and the production decision refer to the same equipment.
More to discover in Numerish.
Explore related insights and practical enterprise workflows.



