Eight harvest bins leave Field 12 before lunch. The packhouse records seven before its afternoon break. Treating the missing bin as a loss at once would give both the harvest report and the dispatch team the wrong story.
Count the movements before comparing weight
Match trip reference, bin identifiers, field lot and dispatch time against each intake record. Suppose the eighth bin stayed on a trailer for the second receiving shift. Mark that bin as dispatched and awaiting intake. The packhouse can then record its actual arrival time. Backdating it into the first shift would make a queue at the receiving dock invisible.
Reconcile using the same basis
Compare net produce weight with net produce weight. A field estimate that includes the containers needs a clearly stated adjustment before anyone investigates shrink. Attach the dispatch or intake exception to the relevant Farm360 harvest lot. The next shift can then tell the difference between a bin it still needs to find and a difference that the receiving scale has already explained.
More to discover in Numerish.
Explore related insights and practical enterprise workflows.



