Skip to article content
NUMERISH / INSIGHTSManufacturing

How to cut off unfinished production orders at month end

Identify completed operations, physical work in progress and accepted finished output at the reporting boundary.

A craftsperson sands an unfinished wooden chair in a workshop.
Manufacturing / Numerish Insight
Jump to a section
  1. 01Count by order status at the boundary
  2. 02Reconcile the postings to the count

A production order straddles month end. The plant has spent labour and material on every unit, yet the warehouse has received only part of the intended finished batch. Forcing the entire order to completion makes the next period start with an unexplained physical difference.

Count by order status at the boundary

Assume 100 units were started. At the cutoff, 65 have passed final inspection and entered finished stock, 25 sit after machining, and ten await inspection. Record those three populations at their locations. The 35 unfinished or pending units should remain identifiable to the controller, including the distinction between an incomplete operation and output awaiting a release decision.

Reconcile the postings to the count

Compare dated material issues, confirmed labour and warehouse receipts with the physical status. Raise any late postings separately so the accountant can apply the site's period policy. Manufacturing360 order references connect those operational records to the close. When inspection resumes next month, its dated dispositions explain how the ten waiting units moved out of their opening position.

Explore the Numerish manufacturing workflows.

KEEP EXPLORING

More to discover in Numerish.

Explore related insights and practical enterprise workflows.

Browse all insights
FROM INSIGHT TO ACTION

Put the ideas to work.

Explore connected workflows for manufacturing businesses.

Explore Manufacturing